IN PLANT SOLUTIONS

Project Description

Provide Sequence Lineside delivery system for Ford Craiova Plant PTA
PTA to be a Fork Lift Free operation
Components to loaded/unloaded in an Ergonomic fashion.
Bespoke design to suit specific requirements
On Site reviews and liaison
Delivery systems for Chassis, Power Train, Glass, Hard and Soft trim components
Contechs Single Point of Contact for whole project
Pre-selected project partners in The UK and Mainland Europe
CAD interaction with Plant layout
Design and manufacture of assembly fixtures and loading tools

Contechs Specific Deliverables:

Programme Management
Project Planning
Cad design from data
Ergonomic Studies
CE Certification
Plant liaison
Maintenance schedules

Contechs Managed Partners’ Deliverables:

Steel Fabrication
Assembly and Finish
Polyurethane Tooling and moulding
Watercut Foam
Fabric Inserts
Polypropylene welded units
Vacuum Formed Trays
High Spec wheels and castors
Turntables and Bearings
Cast towing Hooks and Eyes
Aluminium Perforated Trays

Quoted Project
 

Programme Timing: 12 months

Programme Costs: £600,000